Page 9 - Apmor 2018
P. 9

products & projects








        R                                                      Previously, the best suitable option for clean air was the 1600 cfm oil-

                and-Air introduces the efficient
                                                               free compressor, which for smaller project requirements is more costly
                PTS 800 to their fleet
                                                               in terms of rental rate and diesel consumption. The new PTS800 is the
                Recent research reports suggest that the market for oil-free
                                                               its compact and lightweight stature, it is easy to transport and install.
          compressors will increase by leaps and bounds in the next five years.   ideal solution for customers looking for less than 800 cfm. Thanks to
          With  safety  and  convenience  being  a  concern  for  most  companies,   “The PTS 800 is the ideal solution for applications which require oil-
          especially those in the food industries, the new PTS 800 is a welcomed   free air, as there is no trace of oil in the air produced, certified by the
          addition to the oil-free compressor offering.        ISO class zero certification, the unit guarantees end product quality.
          Rand-Air, market leaders in the rental of compressors and generators,   The PTS 800 has an external fuel connector which enables customers
          is a brand that prides itself on keeping abreast with the technological   to  connect  to  an  external  fuel  tank.  Another  key  advantage  of  this
          changes and upgrades and the introduction of the PTS 800 to their   unit is that it has been designed to suit 24-hour operations, enabling
          fleet  is  testament  to  this.  The  PTS  800  is  the  latest  addition  to  the   businesses to run the system 365 days a year without any problems.
          company’s efficient range of products, delivering 100% oil-free air with   At  Rand-Air  the  100%  safety  and  oil-free  guarantee  of  the  PTS800
          an ISO 8573-1 accreditation.                         comes with a 24/7 availability and a fast, all-in approach, including all
                                                               accessories needed for setup.
          There are industries such as the petrochemical and refinery industry
          where compressed air is critical. By hiring an oil-free compressor, all   Renting equipment from a reliable brand with an outstanding reputation
          applications ensure clean, reliable and cost effective air supply at all   and  good  understanding  of  the  industry  is  highly  recommended  to
          times.                                               ensure that specific needs are met as this allows businesses to focus
                                                               on their business imperatives and the business at hand.
























        R                                                      Nzuri  Copper  CEO  and  executive  director  Mark  Arnesen  said:  “The

                esource estimate for Kalongwe
                                                               results of this high-quality feasibility study show that Kalongwe is an
                project in Congo
                                                               outstanding project, characterised by high copper and cobalt grades,
                Nzuri Copper has declared its maiden ore reserve estimate
                                                               The relative simplicity of the Stage 1 project and anticipated 12-month
          for  its  Kalongwe  copper-cobalt  project  in  the  Kolwezi  region  of  the   low capital and operating costs and strong financial returns.
          Democratic  Republic  of  Congo  (DRC)  after  completing  a  feasibility   timeline to production, once funding and board approvals are secured
          study (FS) for the proposed Stage 1 development.     make this a very attractive foundation project for Nzuri.
          Based on the FS, it was determined that the project has a maiden Ore   With a mine-life of seven years, the project has a pre-tax net present
          Reserve estimate of 6.98Mt at 3.03% Cu and 0.36% cobalt for 211,494t   value (NPV) of $116m and an internal rate of return (IRR) of 71%.
          of contained copper and 25,128t of contained cobalt.   The company is pursuing multiple opportunities to a enhance mine-life
          According to the company, the FS confirms the technical and financial   and production from Kalongwe beyond the Stage 1 project.
          viability of an open-pit mining operation.           Furthermore, in order to secure a funding package, the company is
          The study takes into account an on-site 1Mtpa dense media separation   evaluating options that include potential off-take and strategic partners
          (DMS)  processing  plant  to  produce  two  dry  saleable  concentrate   and conventional debt funding.
          products.



                                                                      AFRICAN POWER   Mining & Oil Review Vol 21, Issue 20, 2017   |    9
   4   5   6   7   8   9   10   11   12   13   14